Context: three different discussions
ANTT announced the extension of the receipt of contributions for Public Hearing 15/2026, related to BR-060/153/DF/GO, until 09/10/2026. The news reports sessions in Goiânia on 22/09 and Brasília on 24/09. It is a discussion about the proposal to readapt the contract; contribution or hearing does not equate to approval of all debated measures.
On another front, the Participatory Meeting 01/2026 on Ecovias Rio Minas foresees meetings in Teresópolis on 29/09 and Nova Iguaçu on 30/09. Meanwhile, the news of the Participatory Meeting 05/2026 deals with methodology for alternative engineering solutions and informs receipt of contributions until 30/09. The three sources were consulted on 22/09/2026; check them for addresses, times, channels, and any changes before participating.
In practice: prepare a contribution that can be located
First, choose the correct process. A suggestion about local access and an observation about project analysis methodology may have different destinations. Identify the consultation or meeting number on the official page and consult its documents.
Organize your statement in four parts: section or item discussed; problem observed; available evidence; proposal or question. Differentiate an individual experience from a measured frequency. If you have records of several trips, describe the period and how you gathered the information, avoiding generalizing from a single episode.
Send only the necessary data through the official channel. Hide personal and commercial information of third parties that are not pertinent. Keep the protocol or confirmation of submission to follow the process, without confusing it with acceptance of the proposal.
TRRC Analysis: from generic request to concrete issue
“Improve access” informs an intention but leaves the problem poorly located. A statement that identifies the point, direction of circulation, and observed difficulty allows for a more precise question to the technical team. This does not guarantee the adoption of the suggestion; it improves the clarity of the material presented.
Impact by profile
The carrier can gather consistent reports of its operations. The shipper can explain access or service difficulties observed in the chain. The autonomous can bring the experience of the route without needing to claim to represent all users.
The TRRC Calendar gathers the events available on the portal. To follow the outcome, search for the corresponding process at ANTT: the closure of participation alone does not inform that a proposal has come into effect.
Sources
ANTT — Public Hearing 15/2026, Ecovias Rio Minas meetings and alternative engineering solutions. Dates are as announced in the sources; this analysis does not interpret the legal validity of the procedures.
